Spur-Haridwar

Development of 6-lane access-controlled Spur to Haridwar from Delhi- Saharanpur- Dehradun Economic Corridor in the state of Uttar Pradesh and Uttarakhand on Hybrid Annuity Mode under Bharatmala Pariyojna (From Ch. 0+000 to Ch. 50+700) (Client: NHAI).

River Ganga as Part of Patna Ring Road

Construction of 6- Lane Bridge and its approaches across River Ganga as Part of Patna Ring Road (NH-131G) starting from Km 8+480 near Sherpur to Km 23+000 near Dighwara in the state of Bihar on EPC Mode..

Urban Extension Road-2 (UER-2)

Detailed Project Preparation for Development of UER-2 between Design Chainage km 15+000 to 28+450 (Package-2) in the State of Delhi on EPC Mode.

 

Satna-Maihar section Project Cost 328.77CR

Satna-Maihar section

Construction of Two lane with paved shoulder from Km 80+800 to Km 120+125 (Satna-Maihar section) of NH 135BG (Design length 39.325 km) under Bharatmala Pariyojna in the State of Madhya Pradesh on EPC Mode.

Haridwar Bypass

Upgradation and Four Laning of Haridwar Bypass Package-I from Ch. 0+000 (Km 188+100 of NH-58) to Ch. 15+100 (Km 5+100 of NH 74) in the state of Uttarakhand on Hybrid Annuity mode.

Development of 6-lane Amritsar-Bhatinda Greenfield

Development of 6-lane Amritsar-Bhatinda Greenfield Section of NH-754A from Junction Bhagta Bhai Ka-Bhadaur Road near Dyalpura Bhai Ka to Junction with Mandi Dabwali-Bathinda Highway (NH54) near Sangat Kalan (From km 93+000 to km 154+866) as part of Amritsar-Jamanagar Economic Corridor in the State of Punjab on Hybrid Annuity Mode under Bhartmala Pariyojna (Package-III).

 

Development of 6-lane Jalandhar Bypass

Development of 6-lane Jalandhar Bypass starting from Kahlwan (NH-03) (Design km. 0+000) ending at Kang Sahbu (NH-703) (Design km. 46+500) via Sarmastpur (NH-44)- Madara (NH-03) -Khajurla (NH-44) (Design Length:46.50 kms) as part of North- South Corridor decongestion in the state of Punjab on HAM mode under Bharatmala Pariyojana.

Banbasa ICP at India Nepal border

Construction of 4-Lane Connectivity to Banbasa ICP at India Nepal border from NH-09 (Old NH-125) (Sitarganj-Tanakpur) at Km 40 near Jagbuda Bridge under Bharatmala Pariyojana on EPC Mode.

Tuivai – Keifang Road NH-102B Mizoram

Up-Gradation To 2 Lane with Paved Shoulder of Tuivai – Keifang Road NH-102B Of Aizawi – Imphal Economic Corridor from Design Ch-0.000 (Bridge Across Tuivai River at Manipur Mizoram Border) To Design Ch-31.280 (Ngopa Village) (Package-1) In the State of Mizoram Under Bharatmala Pariyojna on EPC Mode.

 

Delhi - Saharanpur Package

Rehabilitation and Upgradation of Delhi-Saharanpur PKG-1 Km 0+000 to 61+400 (Design Length 61.4 Km) PKG-2 from Km 61+409 to 124+181 (Design Length 62.7 Km) to four lanes with paved shoulder in the state of U. P. on EPC.

Delhi-Saharanpur-Dehradun economic corridor

Development of six lane access control greenfield highway of Delhi-Saharanpur-Dehradun economic corridor under Bharatmala Pariyojana from Design Chainage 27+000 to Design Chainage 56+500 (Package-II) & from Design Chainage 82+000 to Design Chainage 119+790 (Package-IV) in the state of Uttar Pradesh on EPC Mode.

Jabalpur-Hiran River Section of NH-12

Rehabilitation and Upgradation of Jabalpur-Hiran River Section of NH-12 From Km 10+400 to 66+000 (Design Length 55.60 Km) & from Km 66+000 to 130+000 (Design Length 64.0 Km) to four lane with paved shoulder in the state of Madhya Pradesh on EPC.

Amritsar - Jamnagar

6-lane access-controlled Greenfield highway from km -0.300 to 28.700 (PKG-1) from km 28.700 to km 53.000 (PKG-2) from km 88.000 to km 115.000 (Amritsar – Jamnagar PKG-4) NH 754K in the state of Haryana – Rajasthan.

Nauradehi Wild Life Sanctuary

Construction of 4 laning of Nauradehi Wild Life Sanctuary Section of National Highway – 12 from Km 66+000 to Km 77+960 in the State of Madhya Pradesh

Sagar Link Road – Berkhedi – Sagar

Construction of 4-lane Greenfield highway from km 134+737 to Km 163+253 Bhopal Sagar (Sagar Link Road – Berkhedi – Sagar) under Bharatmala Pariyojana in the State of Madhya Pradesh on EPC Mode